KC CONSTRUCTION CO.
REHABILITATION OF PIKES CREEK DAM
OWNER: Pennsylvania American Water
ENGINEER: Gannett Fleming
PROJECT TYPE: Rehabilitation of Existing Dam
LOCATION: Luzerne County, PA
DESCRIPTION OF PROJECT:
Remove and replace existing primary spillway, repoint and post tension anchor auxiliary spillway. Work activities include:
-
Clearing and Grubbing
-
Design, installation and operation of a temporary dewatering wells
-
Design, installation and removal of a earthen and porta-dam cofferdams
-
40,000 cy of rock excavation for new auxiliary spillway and channel
-
Demolition of the existing concrete auxiliary spillway
-
Rock anchors for new auxiliary spillway
-
Installation of a new 2,500 CY cast in place auxiliary spillway sill
-
Install pre-cast Fusegate Control Structures at auxiliary spillway
-
Installation of downstream embankment toe filters and foundation drainage system
-
Placement of 42,000 cy of select fill at embankment
-
5,200 cy of rip rap protection at upstream embankment
-
DIP Outlet conduit modifications
-
Concrete restoration of main spillway
-
Abandon existing piezometers
-
Furnish and install new piezometers
-
Demo existing upstream underwater closure valves and aeration system
-
Furnish and install new underwater closure valves and aeration system