KC CONSTRUCTION CO.
HEARNS POND DAM IMPROVEMENTS
OWNER: DelDOT/DNREC
ENGINEER: McCormick Taylor
PROJECT TYPE: Rehabilitation of Existing Dam, Spillway, & Outlet Works and Preservation of a National Historic Landmark Building
LOCATION: Seaford, Sussex County, DE
DESCRIPTION OF PROJECT:
-
Protection and preservation of a Nation Historic Building during close proximity construction activities including impact and vibratory driven piling
-
Design and installation of a sheet pile cofferdam to allow demolition of existing spillway and bridge structure
-
Maintaining a constant water elevation in the lake as required by environmental compliance
-
Cast-in-Place concrete ogee spillway (~1200 CY of concrete) with all necessary waterstop details.The concrete ogee was considered mass concrete, so procedures and plans were necessary for DelDOT acceptance.
-
Installation of 6” and 7.5” articulated concrete block (13,750 SF and 8,500 SF) overtopping protection on the crest and downstream slope of the embankment
-
Precast post tensioned double barrel culvert
-
Installation of permanent sheet piles along with impact driven friction piles
-
Installation of new sluice gate and stop log system
-
Installation of a new concrete cast-in-place boat ramp